International Marine Terminal
The primary scope of the $6.9 million project at the International Marine Terminal involved the [...]
Ocean Gateway Project
Work at the Ocean Gateway Expansion was substantially completed in time for the fall 2011 [...]
Stetson II Wind Power
Reed & Reed was selected as the EPC contractor for construction of Phase II of [...]
Berkshire Wind
Reed & Reed was selected as the EPC contractor for this 15 mw wind power [...]
Lempster Wind
Reed & Reed was selected as the B-O-P contractor for this 24mw project in the [...]
Reed & Reed / BIW Megalift
Bath Iron Works is contracted with the US Navy to construct three, DDG-1000, Zumwalt-class destroyers. [...]

Structural Stabilization and Repairs to Berths 1, 2A, and 2B Portsmouth Naval Shipyard
Reed & Reed has recently completed the structural stabilization and repairs to Berths 1, 2A, [...]
Veterans Memorial Bridge
The Veterans Memorial Bridge is a pre-cast segmental bridge that carries US Rt. 1 across [...]
Bull Hill Wind
Reed & Reed was the EPC Contractor for the Bull Hill Wind Project in Eastbrook, [...]
Kingdom Community Wind Project
Reed & Reed started preconstruction services in February 2010 assisting GMP through design, permitting, turbine [...]
Groton Wind Farm
Reed & Reed performed the turbine erection and tower electric work at the Groton Wind [...]
Record Hill Wind
Reed & Reed was the EPC Contractor for the Record Hill Wind Project in Roxbury, [...]
Arch Bridge
In June 2008, Reed & Reed was awarded the contract to replace the existing 600 [...]
Rollins Mountain Wind
Reed & Reed provided EPC services for the Rollins Mountain wind project which is located [...]
Deer Isle Bridge
The contract consisted of rehabilitating the two main suspension piers for the 2048 foot long [...]
Kibby Mountain Wind Power
Reed & Reed has completed the Balance-of-Plant contract with TransCanada for construction of their 132 [...]
Stetson I Wind Power
Reed & Reed was selected as the EPC contractor for construction of the 57mw Stetson [...]

Replace Route 2 bridge over the Penobscot River
Reed & Reed accepted the challenge of this complex bridge replacement project which included design [...]
Marine Terminal Reconstruction
Reed & Reed was selected to rebuild the Webber Oil terminal in Bucksport which included [...]
Construct New Marine Research Pier
Reed & Reed's contract included demolition of the existing concrete pier deck over rock filled [...]
Louisiana Pacific OSL Plant Expansion
Reed & Reed was selected by L-P to construct the foundations and other related work [...]
Payne Road Bridge over MTA Spur
Reed & Reed was prime contractor for this complex, three phase project to replace the [...]
Mars Hill Wind Power
Reed & Reed successfully constructed the first commercial wind farm in New England on top of [...]
Penobscot Narrows Bridge
The Prospect-Verona Bridge is a cable-stayed bridge spanning the Penobscot River. Conceived as a signature [...]
Route 140 Bridge over Androscoggin River
This challenging bridge replacement project over the Androscoggin River included providing a temporary detour bridge, [...]
Mack Point Marine Terminal
This project involves a major upgrade to the existing Mack Point Facility. An existing 1000 [...]

Fairfield – Benton Bridges over the Kennebec River
Construction of a two span bridge and two – three span bridges over the Kennebec [...]
Home Depot Pile Driving
Reed & Reed drove 980 H-Pile totaling over 69,000 ft in seven weeks to support [...]
BIW Blast & Paint Facility
This project involved construction of a state-of-the-art industrial sandblasting and painting building. Reed & Reed [...]
Hancock Sullivan Bridge
This project was a bridge replacement on Route 1 over the Taunton River. This project [...]
Manchester Street Bridge
The Manchester Street bridge spans the Merrimack River. The bridge has four concrete piers supported [...]
Amtrak Bridge Repairs
This project consisted of emergency repairs to a bascule bridge over the Thames River in [...]