Harpswell – Mitchell Field
The Town of Harpswell procured Reed and Reed in the Fall of 2017 for the demolition of the existing Mitchell Field Pier. This project included the removal of a 240-foot-long concrete pier and associated pilings, [...]
Lisbon Center Street Bridge
The Lisbon Center Bridge Street bridge work began in late June 2018 and was set on a fast track 4-month construction schedule to be completed and opened to traffic in the Fall of 2018. The [...]
Berkshire Wind Project Expansion
Reed & Reed has been selected to construct the two turbine expansion at the Berkshire Wind Project. Reed & Reed successfully built Phase I in 2009 and was asked by MMWEC to return for the [...]
Antrim Wind
Reed & Reed is underway on 29 MW Antrim Wind Project located in Antrim, NH. As the EPC contractor, Reed & Reed has been working with Walden Green Energy over the past few years on [...]
Main Street Bridge, Yarmouth
As winter approaches the crew has just completed the phase 2 deck placement and closure pour. Sidewalk, bridge rail, membrane and paving remain to complete phase 2; at which time traffic can be switched for [...]
Deerfield Wind
The Deerfield Wind Project is a 30 MW wind generator facility located in Bennington County, Vermont. The Project includes eight (8) 2.0 MW Gamesa G97 turbines and seven (7) 2.0 MW Gamesa G87 turbines, with [...]
Maine Turnpike York Toll Plaza Mile 8.8 Project, York, Maine
Reed & Reed has recently been awarded the Maine Turnpike York Toll Plaza Mile 8.8 Project in York, Maine. The $40 million Mile 8.8 Project consists of constructing six (6) open, high-speed (70 mph) E-ZPass [...]
Maine Turnpike Exit 44 Open Road Tolling Project, Scarborough, Maine
The Exit 44 Open Road Tolling (ORT) Project in Scarborough Maine consists of replacing the existing toll plaza, construction of two northbound and two southbound open road tolling (ORT) lanes and two northbound and two [...]
Main Street Bridge in Yarmouth
The Yarmouth Main Street bridge replacement project consists of replacing the existing 3-span arched concrete deck structure with a new structure that is nearly identical to the old. The bridge includes decorative pilasters on the [...]
In just 35 days the Weskeag Bridge was demolished and replaced!
South Thomaston Bridge Video