Brookfield White Pine Hydro, LLC procured Reed and Reed in the Summer of 2018 for dredging timber from behind the Wyman Dam located in Bingham, Maine. This project included the removal of approximately 1200 tons of timber material located in front of the dam intakes. In 2007, Reed and Reed, performed similar work for the previous dam owner. The project also included installing a temporary 50-foot access trestle from the northerly shore, and mobilizing 9 sections of sectional barge Flexifloats for the 518 Linkbelt Crane-(150 ton) to sit on. The project began August 1st, 2018 and dredging was complete by mid-October.