In April 2018, the State of Maine awarded Reed & Reed, Inc. the Hunter Cove Bridge project in the amount of 1.1M. The project was listed as an ABC (Accelerated Bridge Construction) project. The project consisted of closing the road and detouring traffic for a maximum period of 100 calendar days. The existing 68’ single span bridge was removed and replaced with a steel pile supported, single 78’ span with a concrete deck on steel girder bridge. In addition, the 500 lineal feet of approaches received new riprap, gravel subbase, pavement and guardrail. The project was complete 10 days ahead of schedule.