Project Description
Construction of a two span bridge and two – three span bridges over the Kennebec River; a new intersection in downtown Fairfield; 1300 meters of roadwork; highway lighting; relocating five utility crossings; and the removal of three existing truss bridges.
Location: Fairfield & Benton, Maine
Owner: Maine Department of Transportation
Completed: July 2003
Cost: $10.725 Million
Contractor: Reed & Reed, Inc.