Project Description

Reed & Reed was chosen as the EPC contractor to work with Walden Green Energy on permitting and design for the 9 turbine project.  Reed & Reed’s contract included Engineering & Design, Civil Infrastructure, WTG Foundations & Erection, Underground & Overhead Electrical Collector System, Collector Substation construction, MET Tower work and the Operations & Maintenance Building.

Reed & Reed’s scope included the construction of:

  • Sitework and access roads/crane paths
  • Wind Turbine Foundations
  • 5 kV Collection System
  • Collector Substation
  • Transmission Line
  • Wind Turbine Erection

Location:             Antrim, NH
Owner:                Walden/Transalta
Completed:        2019
Contractor:         REED & REED